Storage racking systems—whether selective pallet racks, cantilever racks, push-back, or drive-in types—play a crucial role in industrial, manufacturing, and warehousing operations. However, without proper engineering review, these systems can present significant safety risks such as structural collapse, overloading, or improper anchoring, which may lead to worker injury or product loss.
In Ontario, a Pre-Start Health and Safety Review (PSR) is required under OHSA Regulation 851, Section 7, when new or modified storage racking is introduced and not certified by a professional engineer. If a system is relocated, altered, or lacks stamped documentation from the manufacturer, a new PSR becomes mandatory to maintain compliance and protect your workforce.
Triggers for PSR Requirements:
Avoiding a PSR when it’s legally required may result in fines, stop-work orders, or liability in the event of an incident.
HITE Engineering offers comprehensive storage racking PSR services across Ontario. Our licensed engineers specialize in pallet racking compliance reviews and inspections for all types of warehouse and industrial storage systems.
Our PSR Scope Includes:
Our engineers also prepare detailed site reports, including damage assessments, photos of deficiencies, and practical recommendations to ensure OHSA and CSA racking standard compliance.
Our engineering reviews adhere to the following key references:
These standards provide guidance on safe racking installation, periodic inspection requirements, and load rating validation.
To streamline the PSR process and ensure accuracy, please provide the following:
If you’re unsure what documentation you have, we’re happy to assist in determining what’s needed to proceed with your warehouse rack PSR.
After conducting the site inspection and document review, HITE Engineering will provide:
According to CSA A344-17, businesses must perform:
These regular assessments are essential for identifying wear, damage, or unsafe alterations.
All industrial racking must display capacity plaques or signage showing maximum load per bay and shelf. This is mandatory under OHSA and CSA guidelines.
Business owners and managers are legally responsible for maintaining a safe workplace. Under Bill C-45, individuals can face criminal charges if negligence in workplace safety leads to serious injury or death. Ensuring your PHSR for warehouse storage is current and accurate reduces liability and protects your workforce.
With almost 30 years of experience conducting racking inspections across Ontario, HITE Engineering provides:
Whether you operate a large logistics hub or a local storage facility, we’re equipped to guide you through the certification process from inspection to final report.


Call us at 289-724-0522 Or contact us online to request a quote or schedule a site visit.
Ensure your storage racking system in Ontario meets all safety and regulatory requirements. Partner with HITE Engineering for trusted, expert support on your next racking PSR.
